MCQ 1 The fundamental objective of system analysis is to
MCQ 2 _________________ are the Testers of Unit Testing?
MCQ 3 Beta testing will be done by
MCQ 4 What is the meaning of a word "CASE" means in the statement "Using CASE TOOLS".
MCQ 5 If you were to create client/server applications, which model would you go for?
MCQ 6 The SRS (Software Requirement Specification) is said to be consistent if and only if
MCQ 7 A COCOMO model is ________________ .
MCQ 8 Modifying the software to match changes in the ever changing environment is called ________________ .
MCQ 9 ER model shows the ________________ .
MCQ 10 Which of the following is/are not a verification activity?
MCQ 11 Which of the following is not a part of the Test Implementation and Execution Phase?
MCQ 12 FAST stands for ________________ .
MCQ 13 In size oriented metrics, metrics are developed based on the ________________ .
MCQ 14 The intent of project metrics is a
MCQ 15 What do the circles on a data flow diagram represent?
MCQ 16 White box testing is not called as ________________ .
MCQ 17 SDLC stands for
MCQ 18 A ________________ is represented graphically by an arrow into or out of a process.
MCQ 19 Which of the following is/are a phases of SDLC?
MCQ 20 Which of the following is used in high level of testing?
MCQ 21 Software Testing is a process of evaluating a system by manual or automatic means and verify that it satisfies specified requirements or identity differences between expected and actual results.
MCQ 22 The Incremental Model is a result of combination of elements of which two models?
MCQ 23 Which of the following is not included in External failure costs?
MCQ 24 Which of the following is not included in SRS ?
MCQ 25 ________________ and ________________ are not the subject matter of Requirement Analysis.