MCQ 1 Software Requirement Specification (SRS) is also known as specification of ________________ .

Correct Answer Choice D Black box testing
See Answer

MCQ 2 In Software validation, requirements can be checked against following conditions:

  1. If they can be practically implemented
  2. If they are valid and as per functionality and domain of software
  3. If there are any ambiguities
  4. If they are completed
  5. <

    Correct Answer Choice A True
    See Answer

MCQ 3 In OOD, the attributes (data variables) and methods( operation on the data) are bundled together is called ________________ .

Correct Answer Choice C Encapsulation
See Answer

MCQ 4 Cohesion metrics and coupling metrics are metrics in which level of design?

Correct Answer Choice D Component-level design
See Answer


MCQ 5 SRS document (System requirement specification) is a document created by system analyst after the requirements are collected from various stakeholders.

Correct Answer Choice A Yes
See Answer

MCQ 6 Abbreviate the term BSS.

Correct Answer Choice C Box Structure Specification
See Answer

MCQ 7 Configuration management is an essential part of the system maintenance. It is aided with version control tools to control versions, semi-version or patch management.

Correct Answer Choice A True
See Answer

MCQ 8 Which is focused towards the goal of the organization?

Correct Answer Choice A Feasibility study
See Answer


MCQ 9 Which documentation works as a key tool for software designer, developer and their test team is to carry out their respective tasks?

Correct Answer Choice A Requirement documentation
See Answer

MCQ 10 Which software is used to control products and systems for the consumer and industrial markets?

Correct Answer Choice C Embedded software
See Answer

MCQ 11 What is the correctness, completeness, and consistency of the requirements model will have a strong influence on the quality of all work products that follow?

Correct Answer Choice A Requirement Quality
See Answer

MCQ 12 Which tools are used for project planning, cost, effort estimation, project scheduling and resource planning?

Correct Answer Choice B Project management tools
See Answer


MCQ 13 Which tools are helpful in all the stages of SDLC, for requirement gathering to testing and documentation?

Correct Answer Choice C Integrated case tools
See Answer

MCQ 14 Activities and action taken on the data are represented by circle or round-edged rectangles is called ________________ .

Correct Answer Choice B process
See Answer

MCQ 15 Project risk factor is considered in which model?

Correct Answer Choice A Spiral Model
See Answer

MCQ 16 Which of these are the 5 generic software engineering framework activities.

Correct Answer Choice B Communication, planning, modeling, construction and development
See Answer


MCQ 17 Give the name to diagram that represents the flow of activities described by the use cases and at the same time the captors are involved in UML .

Correct Answer Choice B Swim lane diagram
See Answer

MCQ 18 During security testing the tester plays the role of the individual who desires ________________ .

Correct Answer Choice A penetrates the system
See Answer

MCQ 19 CASE Tool stands for.

Correct Answer Choice A Computer Aided Software Engineering
See Answer

MCQ 20 When elements of module are grouped together that are executed sequentially in order to perform a task, is called ______ .

Correct Answer Choice B Procedural cohesion
See Answer


MCQ 21 Which classes represent data stores (e.g., a database) that will persist beyond the execution of the software?

Correct Answer Choice C Persistent classes
See Answer

MCQ 22 CMM model in Software Engineering is a technique of _________________ .

Correct Answer Choice B Improve the software process
See Answer

MCQ 23 Give the name to diagram that represents the flow of activities described by the use cases and at the same time the captors are involved in UML .

Correct Answer Choice B Swim lane diagram
See Answer

MCQ 24 Which software-end factors affecting maintenance cost?

Correct Answer Choice D All of the above
See Answer


MCQ 25 Which risk gives the degree of uncertainty and the project schedule will be maintained so that the product will be delivered in time?

Correct Answer Choice C Schedule risk
See Answer

NTSE, NEET, AIEEE, Olympiad & Other Competive Exams Preparation

Publish Your Article / Write for Us

Article Writing Guide/Help

Trending Questions


Advantages Of NCERT, CBSE & State Boards Solutions For All Subjects

  • All the NCERT Solutions have been prepared by academic experts having 10+ years of teaching experience.
  • They have prepared all the solutions in simple and easy language, so that each and every student can understand the concepts easily.
  • All the solutions have been explained step to step wise in details with better explainations.
  • Students can also use these question and answers for your assignments and in homework help.
  • All the solutions have been explained in detail and the answers have been compiled in a step-wise manner.
  • All the question and asnwers are commonly prepared according to the Latest Syllabus of Board Education and Guidelines.
  • Students can know about the various types of questions asked in the exams with the help of these solutions.

Top Course Categories