MCQ 2 The document which gives only information about the quantity and rates of work is called
MCQ 9 After the complete utility period of anything when it is sold without being dismantted then the earn value of this thing is called
MCQ 3 The actual cost of articles at shop and refers to the supply of articles only and not to the carrying out of work is called
MCQ 5 A procedure of costing and valuation of an item of work on the basis of actual labours and materials is called
MCQ 8 When the original sanctioned estimate is exceeded more than 5% or the expenditure on work exceeded the amount of estimated by more than 10%, then which estimated is preferred
MCQ 7 Estimate which is prepared to maintain the structure or work in proper condition and safe condition is called
MCQ 6 The plan which is prepared for number of buildings and structures and gives all information about the building is called
MCQ 4 The plan which is prepared for number of buildings and structures and gives al information about the building is called
MCQ 1 The plan which gives complete idea about any structure and drawn on a major scale is called
MCQ 10 The total area of building including all rooms, verandas, passages, corridors, stair case, bath, w.c. , store, kitchen. Etc. is called