MCQ 1 The main object of scientific layout is
MCQ 2 The probabilistic time is given by (where to = Optimistic time, tp = Pessimistic time, and tn = Most likely time)
MCQ 3 The determination of standard time in a complex job system is best done through
MCQ 4 The aim of value engineering is to
MCQ 5 A diagram showing the path followed by men and materials while performing a task is known as
MCQ 6 When slack of an activity is negative
MCQ 7 The Statement "Line organisation is suitable for a big organisation" is true or false.
MCQ 8 Job evaluation is the method of determining the
MCQ 9 Fixed position layout is also known as
MCQ 10 In time study, the rating factor is applied to determine
MCQ 11 PERT is an event oriented technique.
MCQ 12 In A-B-C analysis, which class of items are generally large in number?
MCQ 13 Break even analysis is a
MCQ 15 Work study involues
MCQ 14 The type of organisation preferred for a steel industry, is
MCQ 15 In break even analysis, total cost consists of
MCQ 16 Simplex method is the method used for
MCQ 17 Which one of the following chart gives simultaneously information about the progress of work and machine loading?
MCQ 18 The routing function in a production system design is concerned with
MCQ 19 The procedure of modifying work content to give more meaning and enjoyment to the job by involving employees in planning, organisation and control of their work, is termed as
MCQ 20 The correct sequence of phases in value engineering is
MCQ 21 The mathematical technique for finding the best use of limited resources of a company in the maximum manner is known as
MCQ 22 In a functional organization
MCQ 23 String diagram is used
MCQ 24 Probabilistic time for completion of any activity can be found out from
MCQ 25 In inventory control theory, the economic order quantity is